Public synthetic sandbox — no real customer data, no account, no upload, no live AI execution.

Public synthetic sandbox

Take a fictional operation all the way through

Pick one of 8 synthetic scenarios and walk it through 10 stages — from the captured source to the audit trail. Nothing publishes until a manager approves, exactly as in the product. Everything you see is pre-authored sample data held in this browser tab, and refreshing resets it.

Public synthetic sandbox — no real customer data, no account, no upload, no live AI execution. What that means

ManufacturingSynthetic

Machine start-up and pre-shift safety inspection

A press line where the start-up sequence lives in the heads of three experienced operators and nowhere else.

Organisation
Kestrel Components (fictional)
Kind
Metal pressing and sub-assembly
Footprint
Two plants, three shifts, 180 operators

Stage 1 of 10 · Capture

Capture the work as it is actually done

A procedure starts from real work, not a blank document. These are pre-built synthetic sources — nothing was uploaded and no camera or microphone is used anywhere in this demo.

Seen as Manager

You capture the task, or ask a senior operator to. This is the only recording step in the whole loop.

Guided tour. Move forward with Next; stages you have already seen stay open in the rail. Switch to Explore freely to jump around instead.

Pre-built synthetic sources

No file was uploaded, no camera or microphone was used, and no vision model was called. The drawings are diagrams shipped with this page, not photographs.

  • Process frame 1 of 4

    Guard door and interlock at the front of the press, closed, with the isolation switch visible.

  • Process frame 2 of 4

    Control panel showing the mode selector and the two-hand start controls.

  • Process frame 3 of 4

    Lubrication points and the sight glass on the side of the machine.

  • Narration excerpt

    "Before anything, check the guard is seated — if the interlock light isn't steady, stop and call maintenance. Then oil level, then dry cycle, then you can load."

Context around the task

Site
Plant 2, press line B (fictional)
Task
Start-of-shift machine start-up and safety check
Frequency
Three times a day, every day
Why now
Two of the three operators who know it are retiring

Observations drawn from the sources

What a reviewer would take from the material above.

  • The operator checks the guard interlock before touching the controls.
  • A dry cycle is run with no material loaded before the first real part.
  • Lubrication is checked by sight glass, not by a gauge reading.
  • The narration mentions calling maintenance but does not say who or how.